Cementing Operation with Nitrogen, Coiled Tubing
$800.00
- Foamed cement: definition, use (primary cementing, squeeze).
- Cementing through coiled tubing: cement plug, squeeze (squeeze slurry characteristics, job design, key-points).
Course Features
- Lectures 0
- Quizzes 0
- Duration 50 hours
- Skill level All levels
- Language English
- Students 0
- Assessments Yes
Curriculum is empty